MANILA, Philippines — The camp of Department of Public Works and Highways (DPWH) District Engineer Henry Alcantara denied accusations linking him to alleged ghost flood control projects in Bulacan, insisting he had no hand in the supposed scheme.

In a statement issued over the weekend, the Flaminiano Arroyo & Dueñas law firm, which represents Alcantara, said its client “maintains his innocence: he did not author these alleged ghost projects. Any wrongdoing was done behind his back, without his knowledge, acquiescence, or approval.”, This news data comes from:http://wcmx-mkij-up-rnv.gangzhifhm.com
The statement directly counters claims that Alcantara was the “kingpin” of the controversial projects, which authorities are now investigating for possible irregularities.
“Engr. Alcantara will contest every accusation that he had supposedly participated in and/or benefitted from any unlawful scheme,” the law firm said, adding that he would exhaust all legal remedies, including challenging his summary dismissal from service.
DPWH engineer denies role in Bulacan flood control ‘ghost projects’
The camp also vowed Alcantara’s cooperation with the ongoing investigation. “He will continue to assist the authorities in the investigation of these flood control ghost projects. We are confident that in due time, the truth will surface and Engr. Alcantara will be cleared of the baseless accusations levied against him,” the statement read.
DPWH engineer denies role in Bulacan flood control ‘ghost projects’
- Seoul says over 300 South Koreans held in US battery plant site raid
- Searchers retrieve bodies as Afghan quake toll seen to rise
- Protesters storm Discaya compound for second straight day
- Escudero subpoenaes 10 DPWH contractors for Senate probe next week
- Ukraine says Russia linked to lawmaker's killing
- Marcos sacks PNP Chief Torre, saying it was 'difficult but necessary'
- Lacson: Torre 'acted beyond his authority'
- Indonesia, US and allies launch joint military drills
- UN watchdog finds uranium traces at suspected Syrian former nuclear site
- Comelec: Postponed village, youth elections not in 2026 budget